Current Language
    Change Language
    Get a Quote
    HomeProjectsTanzania Logistics Center Power Project

    Tanzania Logistics Center Power Project

    • Project Background

      Cylon Electric Industry Group is collaborating with a large logistics center in Tanzania to deliver a comprehensive power system and associated services. This logistics hub serves as a key commercial and supply chain node, playing an essential role in regional trade and operations.
    • Client Requirements

      The logistics center requires a power system with high stability, reliability, and efficiency. The client seeks a complete solution to support high-power demands of large-scale storage, transportation, and logistics equipment, while complying with environmental and energy-saving standards, and enabling intelligent management for real-time monitoring and scheduling.
    • Cylon Solution

      Cylon provides end-to-end services for the project, including system design, equipment procurement, installation, and ongoing maintenance. We apply internationally advanced power technologies and busway distribution systems to ensure efficient and reliable energy delivery. The intelligent management platform allows real-time monitoring of system performance, optimizes scheduling, improves operational efficiency, reduces maintenance costs, and ensures uninterrupted operation of the logistics center.
    • Project Outcome

      Through this cooperation, Cylon has established an efficient, stable, and intelligent power system for the Tanzania logistics center, providing a solid foundation for daily operations and future expansion. The project further demonstrates Cylon’s comprehensive expertise and professional capability in international logistics and industrial park power solutions. Cylon will continue to uphold its philosophy of “innovation, expertise, cooperation, and win-win” to deliver high-quality power solutions to clients worldwide.